AbouRizk, S M and Dozzi, S P (1993) Application of Computer Simulation in Resolving Construction Disputes. Journal of Construction Engineering and Management, 119(02), 355–73.

Barnes, W C (1993) Microcomputers in Management of Construction Operations. Journal of Construction Engineering and Management, 119(02), 403–12.

Bernold, L E and Salim, M (1993) Placement‐Oriented Design and Delivery of Concrete Reinforcement. Journal of Construction Engineering and Management, 119(02), 323–35.

Carr, R I (1993) Cost, Schedule, and Time Variances and Integration. Journal of Construction Engineering and Management, 119(02), 245–65.

  • Type: Journal Article
  • Keywords: Project management; Cost control; Scheduling; Variance analysis; Computer applications;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1993)119:2(245)
  • Abstract:
    This paper demonstrates detailed schedule‐ and cost‐control relationships at the activity/cost‐account level using generic microcomputer software to budget, track, and control projects. Time variances are introduced to describe differences between scheduled times and actual times for activity and project performance. Variances are the sum of more detailed variances, and variances can be calculated and reported at different levels of detail, whether for activities and cost accounts or for a project as a whole. Activity/cost‐account budgets sum to project budgets, and variances sum to project variances. A unified nomenclature and parallel budget and variance structures allow integration of cost and schedule control for projects that share common work breakdown structures. Budget, actual, and variance values of cost, progress, and time are combined in a single figure to demonstrate integration at the activity/cost‐account level. Equation development is augmented with computer implementation details for generic spreadsheets or custom applications. Examples are presented for a single element from start to completion and for a project of four elements.

East, E W and Kim, S (1993) Standardizing Scheduling Data Exchange. Journal of Construction Engineering and Management, 119(02), 215–25.

Ioannou, P G and Liu, L Y (1993) Advanced Construction Technology System—ACTS. Journal of Construction Engineering and Management, 119(02), 288–306.

McCullouch, B G and Gunn, P (1993) Construction Field Data Acquisition with Pen‐Based Computers. Journal of Construction Engineering and Management, 119(02), 374–84.

Miyatake, Y and Kangari, R (1993) Experiencing Computer Integrated Construction. Journal of Construction Engineering and Management, 119(02), 307–22.

Russell, A D (1993) Computerized Daily Site Reporting. Journal of Construction Engineering and Management, 119(02), 385–402.

Russell, A D and Wong, W C M (1993) New Generation of Planning Structures. Journal of Construction Engineering and Management, 119(02), 196–214.

Tommelein, I D and Zouein, P P (1993) Interactive Dynamic Layout Planning. Journal of Construction Engineering and Management, 119(02), 266–87.

Vanegas, J A, Bravo, E B and Halpin, D W (1993) Simulation Technologies for Planning Heavy Construction Processes. Journal of Construction Engineering and Management, 119(02), 336–54.

Yates, J K (1993) Construction Decision Support System for Delay Analysis. Journal of Construction Engineering and Management, 119(02), 226–44.